You can create a new labour charge field value quickly by copying an existing value and then editing and saving the copy with a new ID. Copying is particularly useful if you want to create a new value with similar settings to an existing value. Creating new values by copying, rather than by using the Add New button, can save time and increase accuracy.

To create a new labour charge field value by copying an existing value:

  1. In Administrator Services, click the Administration tab then click the Setup subtab.

  2. Under the Labor Charge Fields heading, click the name of the labour charge field (for example, Wage Rate Programs) for which you want to create new values by copying.

    A Labour Charge Values page (where Labour Charge is the name of the labour charge field you selected) opens and displays the labour charge field values that have been defined for the labour charge field you selected. For example, if you selected Wage Rate Programs, a Wage Rate Programs page opens and displays the specific wage rate programs that have been created.

  3. On the Labour Charge Values page, click the Copy button in the right column of the row containing the value you want to copy. A Labour Charge page opens that contains a copy of the properties of the original value.

    Tip: You can use the Search Options tools at the top of the Labour Charge Values page to search by ID or Description for the value you want to copy.

  4. In the first field of the Labour Charge page, delete the existing ID and enter a new, unique ID for the new value you are creating. This field is required.

    Tip: The label for the first field will have the same name as the labour charge field. For example, on the Wage Rate Program page, the first field is called Wage Rate Program. Enter a new Wage Rate Program ID in this field. The ID is a code consisting of up to 25 letters and/or numbers that a user will enter into the labour charge field on the Time Sheet, Timecard Manager, scheduling pages, etc. It is helpful to make the ID short and easy to remember.

  5. In the Description section, enter a new, brief description of the value in each language supported by your company. This field is required. Both the ID and the description are displayed in labour charge value lookup windows.

    Tip: Although you can use the descriptions that were copied from the original value, ADP strongly recommends assigning unique descriptions to every labour charge field value.

  6. In the Start Date field, click the Calendar Lookup button and select the date on which you want the value to become available for use.

  7. In the End Date field, click the Calendar Lookup button and select the last date on which you want the value to be available for use.

    Tip: Entering a start date and end date is not required. Values without start and end dates defined are always available if the Active check box is selected. If a start date is defined for a value but no end date is specified, the value will be available indefinitely after the start date has passed, as long as the Active box is checked. If an end date is defined but no start date is given, the value will be available until the end date has passed, as long as the Active box is checked.

  8. If the Supervisor ID field is displayed, add, edit, or delete the supervisor ID as appropriate.

    Notes:
    The Supervisor ID field will only appear if your company has configured the labour charge field for employee loan. If the Supervisor ID field does appear and you enter a supervisor ID, the specified supervisor will be able to view and approve any time pair charged to this labour charge value, even if he or she does not normally supervise the employee who charged time to the labour charge value.

    The supervisor ID is not the same as the supervisor’s Employee ID. It is the supervisor’s User ID. If you are unsure which ID to enter, use the Lookup button to help you find the correct ID.

    To learn more about employee loan see the Loaning and Borrowing Employees Overview.

  9. If necessary, click the Active check box to make the new value active or inactive.

    Notes:
    The Active check box allows you to make a labour charge field value unavailable without deleting it permanently. When you create a new value by copying an existing value, the new value will inherit the Active setting of the original value.

    If the Active check box is selected and no start and end dates are defined, the value is always available. If the Active check box is selected and start and end dates are defined, the value is only available during the specified date range.

  10. Click Submit to save the new labour charge field value.